Views: 40 Author: Site Editor Publish Time: 2026-01-24 Origin: Site
Dura Bade--2.5m × 3.0m HOD SYSTEM
For tasks where other solutions have no right to work with 150T/m².
Not marketing – real load capacity for the heaviest equipment.
photovoltaic farms
Energy and critical infrastructure
cranes, drilling rigs, oversized transport
difficult terrain, poor soil, year-round work
Why temporary access with Dura Mat?
✔ 2.5m × 3.0m format = quick installation
✔ stability without collapse
✔ transfers axial pressures, not just "mass on paper"
✔ system proven in real construction conditions
If the project weighs more than standard – you need a heavy duty system from Shandong Ningjin Xinxing Chemical,a professional manufacturer of ground solutions.
#DrogiTymczasowe #SystemCiężki #Budownictwo #Energetyka #FarmyPV #HeavyDuty #Infrastruktura #TemporaryRoads